Basketball camp 2500m2 in three floors

DESCRIPTION:

Development of water and sewerage system with the development of the service line to the city network to work on connecting shaft. Development of internal fire hydrants made from galvanized steel tubes. Creating a system of heating domestic hot water production and installation of solar plate collectors on the roof. Installing solar thermal buffer 2000l and two combining boiler per 2000l. Heating and cooling of rooms, suites and restaurants individual inverter air conditioners. Creating a system of ventilation restaurants and installation of ceiling suspended ventilation chamber.

Hotel Teo 04 Srebrno Jezero 2500 m2

 Company

Hotel Teo 04

Date Februar-Maj 2016
Location Srebrno Jezero
Area 2.500 m2