Warehouse space 6.000m2
DESCRIPTION OF WORKS:
Adaptation Works production facility and production storage. Dismantling of a steam boiler and making hot water gas boiler. Production of radiator heating in the laboratory and office part of the building. Creating a system for dusting the tobacco dust and the connection to the central cyclone. Modification of ventilation system manufacturing plant and connection to the existing ventilation chamber. Creating a new heating system, fan-storage. Creating a system of flashing vacuum sewer system “WAVIN”. Revamping steam pipe made of chrome steel pipeline.
Company |
JTI SENTA |
---|---|
Date | Jul – Septembar 2013 |
Location | Senta |
Area | 6.000 m2 |